Guo, Tao, Jianhua Yang, and Lie Shi. 2017. “Study on the Application of Double Corridor Project in Managing Geological Defects Affecting Transmission Lines in Mining Areas”. Journal of Mines, Metals and Fuels 65 (10):531-33. https://doi.org/10.18311/jmmf/2017/26963.