Insulation Coordination Studies for 400 kV GIS in a Hydroelectric Project in India

Insulation coordination studies comprising of Switching, Lightning and Very’ Fast Transient overvoltages has been carried out for the 400 kV Gas Insulated Switchgear (GIS) in the Tehri hydroelectric power plant in India. The studies were carried out to decide the various parameters of the switchyard equipment including arrester locations. Results of the switching overvoltages have been validated on the Transient Network Analyser (TNA). This paper discusses some of the results of all these studies.