High Sheath Current in EHV Underground Cable Circuit

Navi Mumbai International Airport (NMIA) is being developed through a Public-Private partnership (PPP) model by M/s City and Industrial Development Corporation (CIDCO). The airport is located off National Highway No. 4B near Panvel and is 35 km from Mumbai’s existing airport. Tata Power’s Overhead Line network was passing through the proposed plot. There were 4 EHV circuits used for transmitting power from Tata Power’s Hydro Generating stations to Mumbai. To facilitate the construction of the NMIA project, CIDCO had requested Tata Power to divert all overhead lines passing through the NMIA site and suggested laying EHV underground cables along the periphery of the airport. The proposed cable route length is 8.5 km between Karnajade and Waghivali Village, with switching stations at Karanajde and Waghivali. The cable circuit design is divided into seven major sections and 21 minor sections with cross-bonding. After the commissioning of underground cable circuits, heavy sheath currents than permissible limits were observed at the termination of one of the circuits. To reduce the sheath currents within limits, a detailed investigation was carried out and the observed issues were addressed. This document gives the idea of areas to be focused on during the installation of EHV cable circuits.

View article page

Download PDF