Failure Forensics of a 31.5 MVA Power Transformer: Cumulative Through-Fault Aging Leading to a Catastrophic Arcing Interturn Fault
A 31.5 MVA, 220/11 kV TELK power transformer failed during energization after approximately 17 years of service. The failureevent COMTRADE record captured assertion of the main-tank pressure-relief-device (PRV) input at 488.475 ms, followed by the 86 internal-trip and PRV-annunciation channels at 490.980 ms, while differential annunciation and the three phase-trip bits remained deasserted. The installed GE MiCOM P643 used 100/1 A HV CTs, 2000/0.5775 A LV CTs (approximately 3464/1), and an Is1 pickup of 0.2 pu. Post-failure DGA measured 56.29 ppm acetylene and 111.18 ppm ethylene; Duval, Rogers, industry three-ratio, and an APTRANSCOdeveloped machine-learning ensemble classified the discharge as D2, with the ensemble assigning 87% probability. The LV R-phase resistance was 19.91% above the Y/B mean, its turns-ratio error remained 1.54– 2.64% over all 17 tap positions, and its excitation current was 9.30 times the Y/B mean. In SFRA, the large low-frequency R-phase separation appeared with the LV winding electrically open and collapsed when the LV was shorted, identifying the reduced-turn/magnetizing-inductance signature of an LV R-phase interturn short. The convergent chemical, electrical, dielectric, frequency-response, protection, and physical evidence establishes a high-energy arcing interturn fault. The recorded operating history — repeated LV-side faults from reptile intrusion and cable puncture — and the measured winding deformation establish cumulative through-fault electrodynamic aging as the failure pathway. The principal contributions are a cross-validated multi-physics forensic workflow and an APTRANSCO-developed machine-learning DGA ensemble that independently corroborates the classical D2 diagnosis, applied here to establish cumulative through-fault aging — rather than a single triggering event — as the operative failure mechanism.