Research Opportunities in Workforce Management

Jump To References Section

Authors

  • Department of Management and Operations, Villanova University, Pennsylvania ,US

Keywords:

Nurse Scheduling, Labor Scheduling.
Office Management

Abstract

In this paper, we review a subset of the labor scheduling literature and discuss areas where additional research is warranted. The review, while not exhaustive, concludes that there are still rich research opportunities to contribute to an already large field. The areas that are still most attractive are those which provide models that solve more than one phase of the workforce management problem in an integrative fashion as has been called for by many researchers. We also present an example of an integrative model found in the literature. In addition, an application area for workforce management that has received much attention but still provides promising research opportunities is the area of nurse staffing. With continued nursing shortages, managers are faced with a difficult task of providing quality care while still maintaining costs.

Downloads

Published

2017-09-22

How to Cite

Wright, P. D. (2017). Research Opportunities in Workforce Management. DHARANA - Bhavan’s International Journal of Business, 4(1), 28–37. Retrieved from https://informaticsjournals.com/index.php/dbijb/article/view/18015

Issue

Section

Research Articles

 

References

Abernathy, W. J., Baloff, N., Hershey, J. C., Wandel, S., "A Three-stage Manpower Planning and Scheduling Model - A Service Sector Example," Operations Research, 21(3), 1973, 693-711.

Agnihothri, S. R., and Taylor, P. F., "Staffing a Centralized Appointment Scheduling Department in Lourdes Hospital," Interfaces, 21(5), 1991, 1-11.

Aiken, L. A, Clarke, S. P., Sloane, D. M., Sochalski, J. A., Busse, R., Clarke, H., Giovannetti, P., Hunt, J., Rafferty, A. M., Shamian, J. 2001. Nurses' Reports On Hospital Care in Five Countries. Health Affairs, 20(3) 43-53.

Andrews, B., and Parsons H., "L. L. Bean Chooses a Telephone Agent Scheduling System," Interfaces, 19(6), 1989, 1-9.

Andrews, B., and Parsons H., "Establishing Telephone-Agent Staffing Levels through Economic Optimization," Interfaces, 23(2), 1993, 14-20.

Bailey, J., "Integrated Days Off and Shift Personnel Scheduling," Computers and Industrial Engineering, 9(4), 1985, 395-404.

Bechtold, S. E., "Implicit Optimal and Heuristic Labor Staffing in a Multiobjective Multilocation Environment," Decision Sciences, 19(2), 1988.

Bechtold, S. E. and Brusco M. J., "Working Set Generation Methods for Labor Tour Scheduling," European Journal of Operational Research, 74(3), 1994, 540-551.

Bechtold, S. E. and Showalter, M. J., "A Methodology for Labor Scheduling in a Service Operating System," Decision Sciences, 18(1), 1987, 89-107.

Berman, O. and Larson R. C., "Determining optimal pool size of a temporary call-in work force," European Journal Of Operational Research, 73(1), 1994, 55-64.

Bordoloi, S. K., and Weatherby E. J., "Managerial Implications of Calculating Optimum Nurse Staffing in Medical Units," Health Care Management Review, 24(4), 1999, 35-44.

Brusco, M. J. and Johns T. R., "Staffing a Multi-skilled Workforce with Varying Levels of Productivity: An Analysis of Cross-training Policies," Decision Sciences, 29(2), 1998, 499-515.

Brusco, M. J., Johns T. R., and Reed J. H., "Cross-Utilization of a TwoSkilled Workforce," International Journal of Operations and Production Management, 18(6), 1998.

Brusco, M. J. and Showalter M. J., "Constrained Nurse Staffing Analysis," Omega, 21(2), 1993, 175-186.

Buffa, E. S., Cosgrove M. J., and Luce B. J., "An Integrated Work Shift Scheduling System," Decision Sciences, 7 (4), 1976, 620-630.

Burns, R. N., and Carter M. W., "Workforce Size and Single Shift Schedules with Variable Demands, Management Science, 31(5), 1985, 599-607.

Burns, R. N., and Koop G. J., "A Modular Approach to Optimal Multiple-Shift Manpower Scheduling, Management Science, 35(1), 1987, 100-110.

Campbell, G. M., "Cross-Utilization of Workers Whose Capabilities Differ," Management Science, 45(5) May 1999, 722-732.

Campbell, G. M., and Diaby M., "Development and Evaluation of an Assignment Heuristic for Allocating Cross-Trained Workers," European Journal of Operational Research, 138, 2002, 9-20.

Dantzig, G. B., "A Comment on Edie's Traffic Delays at Toll Booths," Operations Research, 2(3), 1954, 339-341.

Dijkstra, M. C., Kron L. G., Salomon M., van Nunen J. A. E. E., Van Wassenhove L. N., "Planning the Size and Organization of KLM's Aircraft Maintenance Personnel," Interfaces, 24(6), 1994, 47-58.

Downsland, K. A., "Nurse Scheduling with Tabu Search and Strategic Oscillation," Eurpoean Journal of Operational Research, 106, 1998, 393-407.

Easton, F. F. and Goodale J. C., "Labor Scheduling with Employee Turnover and Absenteeism," Working Paper, Syracuse University, 2002.

Easton, F. F. and Rossin D. F. , "Equivalent Alternative Solutions for the Tour Scheduling Problem," Decision Sciences, 22(5), 1991a, 985-1007.

Easton, F. F., Rossin D. F., "Sufficient Working Subsets for the Tour Scheduling Problem," Management Science, 37(11), 1991b, 1441-1451.

Easton, F. F., Rossin D. F., and Borders W. S., "Analysis of Alternative Scheduling Policies for Hospital Nurses," Production and Operations Management, 1(2) Spring 1992, 159-174.

Easton, F. F. and Rossin D. F.,"A Stochastic Goal Program for Employee Scheduling," Decision Sciences, 27(3), 1996, 541-568.

Gaballa, A. and Pearce W., "Telephone Sales Manpower Planning at Quantas," Interfaces, 9(3), 1979, 1-12.

Graham, M. V., "A Day-to-Day Decision Support Tool," Nursing Management, 26(3), 1995, 48I-48L.

Henderson, W. B. and Berry W. L., "Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis," Management Science, 22(12), 1976, 1372-1380.

Hershey, J. C., Abernathy W. J., and Baloff N., "Comparison of Nurse Allocation Policies - A Monte Carlo Model," Decision Sciences, 5 (1), 1974, 58-72.

Hopp, W. J., and Van Oyen, M. P. (2004). "Agile workforce evaluation: A framework for cross-training and coordination," IIE Transactions 36, 919-940.

Huarng, F., "A Primary Shift Rotation Nurse Scheduling Using ZeroOne Linear Goal Programming," Computers in Nursing, 17 (3), 1999, 135-144.

Hueter, J., and Swart, W., "An Integrated Labor-Management System for Taco Bell," Interfaces, 28(1), 1998, 75-91.

Hung, R., "A Cyclical Schedule of 10-Hour, Four-Day Workweeks," Nursing Management, 22(9), 1991,30-33.

Hung, R., "Multiple-Shift Workforce Scheduling Under the 3-4 Workweek With Different Weekday and Weekend Labor Requirements," Management Science, 40(2), 1994, 280-284.

Hur, D., Mabert V. A., & Bretthauer K. M., "Staff Adjustment Decisions: An Investigation and Evaluation," Working Paper, Indiana University, 2003.

Ikem, F. M., and Reisman A. M., "An Approach to Planning for Physician Requirements in Developing Countries using Dynamic Programming," Management Science, 38(4), 1990, 607-618.

Jaumard, B., F. Semet, and Vovor T., "A Generalized Linear Programming Model for Nurse Scheduling," European Journal of Operational Research, 107(1), 1998, 1-18.

Jones, C. B. (2005). "The costs of nursing turnover, part 2," Journal of Nursing Administration, 35(1), 41-49.

Jones, C. B. (2007). "Revisiting nurse turnover costs," Journal of Nursing Administration, 38(1), 11-18.

Kao, E. P. C., and Queyranne M., "Budgeting Costs of Nursing in a Hospital," Management Science, 31 (5), 1985, 608-621.

Keith, E . G., "Operator Scheduling," AIIE Transactions, 1979, 11 (1), 37-41.

Kao, E. P. C., and Tung G. G., "Aggregate Nursing Requirement Planning in a Public Health Care Delivery System," Socio-Economics Planning Science, 15, 1981, 119-127.

Koop, G. J., "Multiple Shift Workforce Lower Bounds," Management Science, 34(10), 1988, 1221-1230.

Krajewski, L. J., Ritzman L. P., and McKenzie P., "Shift Scheduling in Banking Opeations: A Case Application, Interfaces, 10(2), 1980, 1-8.

Lanser, E. G. "A Model Workplace: Creating an Effective Nursing Environment," Healthcare Executive, 16(4), 2001, 6-11.

Loucks, J. S. and Jacobs F. R. , "Tour Scheduling and Task Assignment of a Heterogeneous Work Force: A Heuristic Approach," Decision Sciences, 22, 1991, 719-738.

Love, R. R. and Hoey J. M., "Management Science Improves Fast-Food Operations," Interfaces, 20(2), 1990, 21-29.

Lovern, E., "Rx for Nurses, Final version of staffing legislation in the works," Modern Healthcare, January 7, 2002, 10.

Mabert, V. A., "A Case Study of Encoder Shift Scheduling Under Uncertainty," Management Science, 25(7), 1979, 623-631.

Mabert, V. A. and Watts, C. A. "A Simulation Analysis of Tour-Shift Construction Procedures," Management Science, 28(5), 1982, 520-532.

Malhotra, M. K., and Ritzman L. P., "Scheduling Flexibility in the Service Sector: A Postal Case Study," Production and Operations Management, 3(2), 1994, 100-117.

Marchionno, P. M., "Modified Cyclical Scheduling: A Practical Approach," Nursing Management, 18(10), 1987, 60-67.

Mason, A. J., Ryan D. M. and Panton D. M., "Integrated Simulation, Heuristic and Optimisation Approaches to Staff Scheduling," Operations Research, 46(2), 1998, 161-175.

Miller, H. E., Pierskalla W. P., and Rath G. J., "Nurse Scheduling Using Mathematical Programming," Operations Research, 24(5), 1976, 857-870.

Needleman, J., Buerhaus P., Mattke S., Stewart M. and Zelevinsky K., "Nurse-Staffing Levels and the Quality of Care in Hospitals," New England Journal of Medicine, 346(22), 2002, 1715-1722.

Ozkarahan, I. and Bailey J. E., "Goal Programming Model Subsystem of a Flexible Nurse Scheduling Support System," IIE Transactions, 20(3), 1988, 306-316.

Pinker, E. J. and Shumsky R. A., "The Efficiency-Quality Trade-off of Cross-Trained Workers," Manufacturing and Service Operations Management, 2 (1), 2000, 32-48.

Quinn, P., B. Andrews, and Parsons H., "Allocating Telecommunications Resources at L.L. Bean, Inc.," Interfaces, 21(1), 1991, 75-91.

Ritzman, L., Krajewski L., and Showalter M., "The Disaggregation of Aggregate Manpower Plans," Management Science, 22(11), 1976, 1204-1214.

Segal, M., "The Operator-Scheduling Problem: A Network-Flow Approach," Operations Research, 32(4), 1974, 808-823.

Schaffner, J. W., and Ludwig-Beymer, P. (2003). Rx for the nursing shortage: A guidebook. Chicago, IL: Health Administration Press.

Showalter, M. J. and Mabert V. A., "An Evaluation of a Full-/Part-time Tour Scheduling Methodology," International Journal of Operations and Production Management, 8(7), 1988, 54-71.

Siferd, S. P. and Benton W. C., "Workforce Staffing and Scheduling: Hospital Nursing Specific Models," European Journal of Operational Research, 60(3), 1992, 233-246.

Staff Writer, "Nurses march on Washington over ‘alarming' issue of overtime," Modern Healthcare, 32(19) May 13, 2002.

Stimson, R. H., and Stimson D. H., "Operations Research and the Staffing Problem," Hospital Administration, XVII (Winter 1972), 61-69.

Sze, D. Y., "A Queueing Model for Telephone Operator Staffing," Operations Research, 32(2), 1984, 229-249.

Thompson, G. M., "Shift Scheduling in Services When Employees Have Limited Availability: An L. P. Approach," Journal of Operations Management, 9(3), 1990, 352-370.

Thompson, G. M., "Accounting for the Multi-Period Impact of Service When Determining Employee Requirements for Labor Scheduling," Journal of Operations Management, 11(3), 1993, 269-287.

Thompson, G. M., "Labor Scheduling Using NPV Estimates of the Marginal Benefit of Additional Labor Capacity," Journal of Operations Management, 13(1), 1995.

Thompson, G. M., "Assigning Telephone Operations to Shifts at New Brunswick Telephone Company," Interfaces, 27(4), 1997a.

Thompson, G. M., "Labor Staffing and Scheduling Models for Controlling Service Levels," Naval Research Logistics, 44, 1997b, 719-740.

Thompson, G. M., "Labor Scheduling: Part 4. Controlling Workforce Schedules in Real Time," Cornell Hotel and Restaurant Administration Quarterly, 40 (3), 1999, 85-96.

Tieman, J., "Standing by on nurse staffing," Modern Healthcare, Chicago Sep 3, 2001a.

Tieman, J., "Counting Down," Modern Healthcare, Chicago Dec 24-31, 2001b.

Tieman, J., "Absolute Minimum," Modern Healthcare, Chicago Jan 28, 2002a

Tieman, J., "But does it work? Measuring the effect of the staffing ratios could be tough," Modern Healthcare, Chicago Mar 4, 2002b.

Trivedi, V. M. and Warner, D. M. "A Branch and Bound Algorithm for Optimum Allocations of Float Nurses," Management Science, 22(9), 1976, 972-981.

Vaughan, T., "Examination and Optimization of On-Call Labor Scheduling," Proceedings of the Decision Sciences Institute National Meeting, Decision Sciences Institute, 1995.

Vaughan, T., "Shift-Scheduling with On-Call Labor," Proceedings of the Decision Sciences Institute National Meeting, Decision Sciences Institute, 1996.

Venkataraman R., and Brusco M. J., "An Integrated Analysis of Nurse Staffing and Scheduling Policies," Omega, 24(1), 1996, 57-71.

Warner, D. M., "Scheduling Nursing Personnel According to Nursing Preference: A Mathematical Programming Approach," Operations Research, 24(5), 1976, 842-856.

Warner, D. M., and Prawda J., "A Mathematical Programming Model for Scheduling Nursing Personnel in a Hopital," Management Science, 19(4), 1972, 411-422.

Wright, P. D., Bretthauer, K. M., and Cí´té, M. (2006). "Reexamining the nurse scheduling problem: staffing ratios and nursing shortages," Decision Sciences, 37(1), 39-70.

Wright, P. D. and Mahar, S. (2009) "Centralized Nurse Scheduling to Simultaneously Improve Schedule Cost and Nurse Satisfaction," under review at Omega.

Wright, P. D., and Bretthauer, K. M. (2009) "Combating the Nursing Shortage Coordinated Decision Making and Workforce Flexibility," under review at Decision Sciences.