Amelioration of production and safety in bord and pillar work through the deployment of continuous miner technology

Jump To References Section

Authors

  • ,IN
  • ,IN
  • ,IN
  • ,IN

DOI:

https://doi.org/10.18311/jmmf/2022/30428

Keywords:

Underground coal mine, depillaring, numerical modelling, continuous miner, strata monitoring, instrumentation.

Abstract

The nation’s standard of living depends on its quantum of production and use of natural resources, including coal. Coal plays a major role in the development of a country like India. India has great potential of producing coal economically. Unfortunately, even after the nationalisation of 50 years of major Indian coal mines, we still have lower productivity than other coal-producing countries. The Indian mining industry has improved productivity in the opencast sector, but unfortunately, the industry still has to improve productivity in the underground sector. The underground coal is more free from any dirt, which is more acceptable for the user. If the underground productivity of the Indian coal industry is seen, it is the lowest compared to the countries producing coal. Initially, the industry thought of using the longwall technology but could not succeed of its limitations. For the last 20 years, the underground coal mines have been experiencing continuous miner who is not very expensive (as in the case of Longwall), not requiring the major restructuring of the old structures, having good productivity and more safety in operation. This paper deals with continuous miners and their success in the bord and pillar method.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Downloads

Published

2022-06-10

How to Cite

Samanta, S., Kumar Sinha, R., Baran Chakrabarty, P., & Kumar, H. (2022). Amelioration of production and safety in bord and pillar work through the deployment of continuous miner technology. Journal of Mines, Metals and Fuels, 70(2), 64–74. https://doi.org/10.18311/jmmf/2022/30428
Received 2022-06-10
Accepted 2022-06-10
Published 2022-06-10

 

References

Modi J, Bharti S. (2017): Applicability of Continuous Miner in Room and Pillar Mining System/ : Higher Production and Productivity with Safety Applicability of Continuous Miner in Room and pillar mining system/ : Higher Production and productivity with safety. In: Int. Conf. on Deep Excavation, Energy Resource and Production. IIT Kharagpur, India.

Das AJ, Mandal PK, Paul PS, Sinha RK. (2018): Strategies for Underground Extraction of the Inclined Coal Seams By Continuous Miner. MGMI. July.

Mandal PK,. Technological Developments and R&D Needs For Sustainable Underground Coal Mining In India. In: Advanced Mining Technology Department, CSIR-Central Institute of Mining & Fuel Research. Barwa Road, Dhanbad :1-22.

Leeming JJ. (2003): Joy introduce continuous miner: Technology into India. Coal Int Quarr World. 2003:203-206.

Director general of mining safety. Coal Mine Regulation (2017): In: Ministry of Labour and Employment. Vol 3. Dhanbad; 2017:160-280.

Corp. Group KM. 12CM Series. Vol Broucher. UK; 2022.

India G of. Central Electricity Authority Regulation, 2010. Nee Delhi; 2010.

IBM. Indian Minerals Yearbook 2018 (Part-III: Mineral Reviews). Vol COAL AND L. Nagpur; 2019. http:// ibm.nic.in/writereaddata/files/07102019170220COAL_ AR_2018.pdf.

Miner CC. CM345 N.

Engineering JA. W i l d c At. Australia; 2006.

Technology SM and R. Mc470 Continuous Miner.; 2022.

Mangal A. (2021): Strata Stability Investigation and Convergence Monitoring (SSICM) in Thick-Seam Depillaring with Caving by Cable Bolting Method. Mining, Metall Explor. 38(2):927-944. doi:10.1007/ s42461-020-00371-x

Mark C, Zelanko JC. Sizing of final stumps for safer pillar extraction. 2001:1-8.

Pile J, Bessinger S, Mark C, Tadolini SC (2003: Shortencapsulation pull tests for roof bolt evaluation at an operating coal mine. 22nd Int Conf Gr Control Min. (8):226-232.

Keith Mac Andrew IG. (2009): Geotechnical Assessment For The Mechanised Development And Subsequent Extraction Of R-Vii Seam By Bord And Pillar Method , Sarpi Colliery , Ecl,” 2009. Vol 44.

Mandal PK, Das AJ. Planning of Strata Control Study Programmeme During Depillaring Planning of Strata Control Study Programmeme During Depillaring. 2017; (January).

Most read articles by the same author(s)