Roadheader Performance during Development of a Coal Drive

Jump To References Section

Authors

  • Assistant Professor, Department of Mining Engineering, Indian School of Mines, Dhanbad 826004 ,IN
  • M.Tech. (TUST) Student, Department of Mining Engineering, Indian School of Mines, Dhanbad 826004 ,IN

Keywords:

Roadheader, Coal Drive, Rock Strength, Performance, Rock Cutting.

Abstract

Drilling and blasting is the most widely used excavation method in mining and tunnelling especially in hard rock conditions. But in recent years, the application of mechanical excavators in hard rock, especially in fractured geological formations has increased considerably. Mechanical excavation is very attractive for many project because of their techno-economic advantages including improved safety, ease from automation, finished and undamaged excavation dimension, almost nil ground vibration, etc. Under mechanical excavation roadheaders can be a good option. It is a versatile excavation machines favoured in mining operation due to a high degree of mobility, flexible cutting profile, selective mining, providing immediate access to the face and the capability to cut medium strengths rocks. It is also seen performing in high strength rock but only in case of moderately jointed rocks. Performance analysis of roadheader in soft rock drivages is an important task. This can be determined by studying various performance tests or models and carrying out actual underground cutting. With this respect, a data-base was established from detailed field data including the measured instantaneous cutting rates (ICR) and geo-mechanical parameters (uniaxial compressive strength) of the coal measure rocks for each cutting condition in the tunnels. In this paper the study was conducted at two different coal mines to analyse the performance of roadheader vis-à-vis performance predicted by one model. It was found that the roadheaders are working below the predicted performance in development drive of coal mine.

Downloads

Download data is not yet available.

Downloads

Published

2022-10-17

How to Cite

Choudhary, B., & Khan, A. M. (2022). Roadheader Performance during Development of a Coal Drive. Journal of Mines, Metals and Fuels, 64(5), 99–104. Retrieved from https://informaticsjournals.com/index.php/jmmf/article/view/31476

Issue

Section

Articles

 

References

Dariusz Jasiulek, Krzysztof Stankiewicz (2011): “An adaptive control system of roadheader with intelligent modelling of mechanical features of mined rock”, Journal of KONES Powertrain and Transport, Vol. 18, No. 2 .

Bilgin, N., Yazýcý, S., Eskikaya, S. (1996): “A model to predict the performance of roadheaders and impact hammers in tunnel drivages”, EUROCK, September 2-5, Torino, pp: 710-721.

Bilgin, N., Kuzu, C., Eskikaya, S., (1997): “Cutting performance of rock hammers and roadheaders in Istanbul Metro drivages”. In: Proceedings, Word Tunnel Congress’97, “Tunnels for People”, Balkema, pp: 455–460.

Copur, H., Tuncdemir, H., Bilgin, N., Dincer, T (2001): ‘‘Specific energy as a criterion for the use of rapid excavation systems in Turkish mines”. The Institution of Mining and Metallurgy. Transactions Section – A Mining Technology 110, November–December, pp: 149–157.

Barendsen P. (1970): Tunnelling with Machines Working on the Undercutting Principle, (Ed) Goodman J. A., ‘‘The Technology and Potential of Tunnelling”, Proceedings of South African Tunnelling Conference, July, pp. 53 – 58.

Poole, RW, and Farmer, I W. (1980): “Consistency and repeatability of Schmidt hammer rebound data during field testing” (Technical Note) Int. Journal Rock Mech Mm SeiGeomechAbstr 17, November, pp: 167-171.

Farmer, I.W., Garrity, P., (1987): “Prediction of roadheader cutting performance from fracture toughness considerations”. In: Proceedings of the 6th International Congress on Rock Mechanics, Montreal, Canada, vol. 1, pp. 621–624.

Bilgin, N., Seyrek, T., Shahriar, K. (1988): ‘‘Roadheader performance in Istanbul”, Golden Horn clean-up contributes valuable data. Tunnels and Tunnelling, June, pp: 41–44.

Gehring, K. H., (1989): A cutting comparison, Tunnels & Tunnelling, pp: 27-30.

Bilgin, N., Seyrek, T., Erdinc, E., Shahriar, K., (1990): Roadheaders glean valuable tips for Istanbul Metro. Tunnels and Tunnelling, October, pp: 29–32.

Fowell, R.J. and Johnson, S.T. (1991): “Cuttability Assessment Applied to Drag Tool Tunnelling Machines”, Proc. 7thInt. Congress Rock Mechanics. ISRM ed. Wittke, A.A. Balkema, Achen, pp :985-990.

Rostami, J., Ozdemir, L., Neil, D.M. (1994): Performance prediction: a key issue in mechanical hard rock mining. Mining Engineering, pp:1263–1267.

J. Rostami, L. Ozdemir, D.M. Neil (1994): Performance prediction: a key issue in mechanical hard rock mining, Mining Engineering (November), pp. 1263–1267.

Copur, H., Ozdemir, L., Rostami, J. (1998): “Roadheader applications in mining and tunnelling industries”, The Mining Engineer, March, pp:38-42.

Copur, H., Rostami, J., Ozdemir, L., Bilgin, N. (1997): Studies on performance prediction of roadheaders. In: Proceedings of the 4th International Symposium on Mine Mechanization and Automation, Brisbane, Qld., Australia, pp: A4-1–A4-7.

Thuro, K., Plinninger, R.J. (1998): “Geological limits in roadheader excavation – four case studies”, 8th International IAEG Congress, Balkema, Rotterdam, pp: 21-25.

Thuro, K., Plinninger, R.J. (1999): “Roadheader excavation performance-geological and geotechnical influences”, 9th ISRM Congress Paris, Theme 3: Rock dynamics and tectonophysics/rock cutting and drilling, pp:25-28.

Thuro, K.Plinninger, R.J. (1999): “Predicting roadheader advance rates”. Tunnels and Tunnelling International, June, pp: 36–39.

Ebrahimabadi A., Goshtasbi, K. Shahriar, M. CheraghiSeifabad, (2010, 2011): “Predictive Models for Roadheaders Cutting Performance in Coal Measure Rocks”, Bulletin of the Earth Sciences Application and Research Centre of Hacettepe University, 32 (2), pp: 89-104.

Torabi, S. R. (2005): “Reliability of the application of Schmidt hammer in determination of the UCS”, Final project report, in Persian, Shahrood University of Technology, and Shahrood, Iran.

Brown, E.T. (1981): ISRM suggested methods – rock characterization, testing and monitoring, Pergamon Press, Oxford.