Evaluation on Floor Water Inrush Danger of Weibei during Mining over Pressurized Water and Prevention Countermeasures to the Water Disaster

Jump To References Section

Authors

  • College of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an, Shaanxi, 710 054 ,CN
  • College of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an, Shaanxi, 710 054 ,CN
  • Key Laboratory of Coal Resource Exploration and Comprehensive Utilization, Ministry of Land and Resources, Shaanxi Coalfield Geophysical Prospecting and Surveying Group Co. Ltd., Xi’an, Shaanxi, 710 006 ,CN
  • Key Laboratory of Coal Resource Exploration and Comprehensive Utilization, Ministry of Land and Resources, Xi’an, Shaanxi, 710 006 ,CN
  • Key Laboratory of Coal Resource Exploration and Comprehensive Utilization, Ministry of Land and Resources, Shaanxi Coalfield Geophysical Prospecting and Surveying Group Co. Ltd., Xi’an, Shaanxi, 710 006 ,CN
  • Key Laboratory of Coal Resource Exploration and Comprehensive Utilization, Ministry of Land and Resources, Shaanxi Coalfield Geophysical Prospecting and Surveying Group Co. Ltd., Xi’an, Shaanxi, 710 006 ,CN

Keywords:

Water Inrush, Evaluation, Prevention, Confined Aquifer.

Abstract

With increasingly high comprehensive mining intensity to the coal resources and wider mining width of the mining area, the mines of Chenghe No.2 mineral are getting deeper and deeper and the hazard from the high pressure water of Ordovician limestone of #5 coal bed bottom is getting increasingly intense, which will seriously influence safety production of the mines. Therefore, how to liberate the under draught coal reserves of #5 water body is a difficult problem as well as the key issue to ensure safety production of the mines. As for this, the first author will combine with the hydrogeological condition of Chenghe No.2 mineral in this article, and adopt standardized water bursting coefficient method to evaluate the water insulation capability of Taiyuan formation #5 coal floor upon comprehensive analysis on influencing factors of floor water inrush, to consider whether to divide #5 coal floor under waterdiversion failing zone thickness into different compensated mining areas, having predicted water inrush probability of the mining area in the future, and to release the coal reserves threatened by Ordovician water disaster. The result shows: (1) Among the factors that influence #5 coal floor water inrush of Chenghe No.2 mineral, head pressure of the aquifer is motive power of water inrush, the floor strata lithology and its combination feature are safety barrier for confined water extraction, and geological structure is in most cases the channel of floor water inrush; in accordance with the latest stipulations on mine water prevention and control and design specifications on coal mine water prevention, the first author takes 0.06MPa/m and 0.1MPa/m as boundary conditions of critical water inrush coefficient, divides #5 coal floor water-resisting layer into compensated mining extremely dangerous zone, dangerous zone and exploitable zone; (2) As to areas that mining above the pressured water are inapplicable in consideration of the coal floor water-diversion failing zone, latest water bursting coefficient formula can be adopted to realize safe compensated mining, which has reduced danger of floor water inrush, and satisfied the requirements of safe compensated mining of this mining area; (3) Without considering condition of the water-diversion failing zone, it can liberate compressed coal reserves of #5 coal floor that are threatened by Ordovician limestone water disaster and enhance the recovery ratio of coal resources; (4) Based on the evaluation results of floor water inrush danger, the author has proposed major water disasters to the coal floor and prevention countermeasures, which has provided valuable reference for safety compensated coal mining above seam floor pressure-bearing water body of Chenghe minerals and even Weibei coalfield, brought tremendous social and economic benefits, is of practical significance for realization of green coal mining, and will drive local economic development, thus worth being generalized and applied.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Downloads

Published

2022-10-20

How to Cite

Ang, L., Qiang, M., Li, K., Ang, L., Lei, C., & Wei, W. (2022). Evaluation on Floor Water Inrush Danger of Weibei during Mining over Pressurized Water and Prevention Countermeasures to the Water Disaster. Journal of Mines, Metals and Fuels, 66(4), 231–244. Retrieved from https://informaticsjournals.com/index.php/jmmf/article/view/31690

Issue

Section

Articles

 

References

Hu, X. Y., Wang, L. J., Lu, Y. L. and Yu, M. (2014): “Analysis of insidious fault activation and water inrush from the mining floor.” International Journal of Mining Science and Technology, 2014, 24(4):477-483.

Li, A., Liu, Y. and Mou, L. (2015): “Impact of the Panel Width and Overburden Depth on Floor Damage Depth in No. 5 Coal Seam of Taiyuan Group in Chenghe Mining Area.” Electronic Journal of Geotechnical Engineering, 2015, 20(6): 1603-1617.

Yao, B. H., Bai, H. B. and Zhang, B. Y. (2012): “Numerical simulation on the risk of roof water inrush in Wuyang Coal Mine.” International Journal of Mining Science and Technology, 2012, 22(2):273-277.

Qiu, B. and Luo, Y. (2011): .“Subsurface Subsidence Prediction Model and Its Potential Applications for Longwall Mining Operations.” Journal of Xi’an University of Science and Technology, 2011, 31(6):823-829.

Li, A., Gu, S. C. and Chen, F. F. (2013): “Theoretical Analysis and Numerical Simulation of Destroyed Depth of Coal Seam Floor During Bearing Mining: with Seam No. 5 in Dongjiahe Mine, Chenghe Mining Area, Shaanxi as Example.” Coal Geology & Exploration, 2013, 41(4):56-60.

Zhang, Y. X., Tu, S. H., Bai, Q. S. and Li, J. J. (2013): “Overburden fracture evolution laws and water-controlling technologies in mining very thick coal seam under water-rich roof.” International Journal of Mining Science and Technology, 2013, 23(5):693-700.

Wang, J. A. and Park, H. D. (2003): “Coal mining above a confined aquifer.” International Journal of Rock Mechanics and Mining Sciences, 2003, 40(4):537-551.

Li, A., Zhu, Y. Y., Xu, X. Y. and Yang, R. (2015): “Study on the prediction of wear resistances of anchor rods coated Ni-TiN coatings by using BP model.” Functional Material, 2015, 46(6):133-135.

Li, Y. and Qiu, B. (2012): “Investigation into Key Strata Movement Impact to Overburden Movement in Cemented Backfill Mining Method.” Procedia Engineering, 2012, 31():727-733.

Shi, L. Q., Qiu, M., Wei, W. X., Xu, D. J. and Han, J. (2014): “Water inrush evaluation of coal seam floor by integrating the water inrush coefficient and the information of water abundance.” International Journal of Mining Science and Technology, 2014, 24(5):677-681.

Li, A., Gu, S. C., Ye, D. S. and He, M. Z. (2014): “Optimal Simulation for Cable Anchor and Beam Coupling Support in Soft Compound roof Coal Seam.” Mine Safety, 2014, 45(10):187-190.

Zhang, J. (2005): “Investigations of water inrushes from aquifers under coal seams.” International Journal of Rock Mechanics and Mining Sciences, 2005, 42(3):350-360.

Li, A. (2014): Experimental research of seepage characteristics caused by coal floor rock full of stress and strain process, operated by No.5 taiyuan group. ‘the 3rd ISRM International Young Scholars’ Symposium on Rock Mechanics, 2014, 42(2):143-148.

Wei, J., Li, Z. and Shi, L. (2010): “Comprehensive Evaluation of Water-Inrush Risk from Coal Floors.” Mining Science and Technology, 2010, 20(1):121-125.

Zhang, J. and Shen, B. (2004): “Coal mining under aquifers in China: a case study.” International Journal of Rock Mechanics and Mining Sciences, 2004, 41(4):629-639.

Wang, X. Z., Xu, J. L., Zhu, W. B. and Li, Y. C. (2012): “Roof pre-blasting to prevent support crushing and water inrush accidents.” International Journal of Mining Science and Technology, 2012, 22(3):379-384.

Li, J. H., Gu, S. C. and Li, A. (2010): “Regularity of strata pressure in high mining height working face in shallow coal seam.” Journal of Xi’an University of Science and Technology, 2010, 30(4):407-416.

Li, A. and Li, K. F. (2016): “Floor water inrush risk evaluation for mining above confined aquifer in no. 5 coal seam of Taiyuan group at Dongjiahe coal mine.” Electronic Journal of Geotechnical Engineering, 2016, 21(5):1809-1822.

Ding, H. D., Miao, X. X., Ju, F., Wang, X. L. and Wang, Q. C. (2014): “Strata behavior investigation for high-intensity mining in the water-rich coal seam.” International Journal of Mining Science and Technology, 2014, 24(3):299-304.

Most read articles by the same author(s)