A Modelling Study on Multi-Mine and Multiproduct in Guizhou Province, China
Keywords:
Model, Optimal Product Portfolio, Bauxite, Dispersant.Abstract
Using dynamic planning method to construct the model for multi-mine and multi-product, this research tries to establish a new normal bauxite mine industry and upgrade the scientific production decision of bauxite industry. The optimal results, based on 6 bauxite deposits, show that after optimization, the inventory costs of 6 bauxite mines in 2016 have been reduced. Meanwhile, the optimal production decision suggests that, in the current new normal, bauxite enterprises should realize that this decision of expanding individual mine production to reduce the unit cost of bauxite may be unable to get the maximum profit as a whole.
Downloads
Metrics
Downloads
Published
How to Cite
Issue
Section
License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.