A Case Study to Determine OEE – A KPI Representing the Overall Productivity of a Machine

Jump To References Section

Authors

  • Associate Professor, Dept. of Mech. Engg., P.A. College of Engineering, Mangalore, Karnataka ,IN
  • Professor, Dept. of Mech. Engg., School of Engineering, Presidency University, Bangalore, Karnataka ,IN
  • Professor, Dept. of Mech. Engg., School of Engineering, Presidency University, Bangalore, Karnataka, India ,IN
  • Assistant Professor, Dept. of Mech. Engg., P.A. College of Engineering, Mangalore, Karnataka, India ,IN

DOI:

https://doi.org/10.18311/jmmf/2023/33720

Keywords:

OEE, KPI, TPM, world-class OEE, mechanical press, downtime, productivity

Abstract

The industrial sector has experienced an exceptional degree of change in the past few decades. Also, remarkable developments have taken place in the maintenance management systems to reduce downtime and various losses associated with it. Nowadays maintenance is never treated as a profitless activity, instead it is considered as an integral part of business which improves quality of the products as well as productivity of the machines. Ensuring world-class standard of operations to meet the customer requirements is a major challenge to any manufacturing industry. The industry must be in a position to provide the best in class quality of goods and services to its customers. This research work is carried out in a small and medium scale manufacturing industry located in the southern part of Karnataka state. Initially two mechanical presses – one having 600 tonne and the other with 800 tonne capacity were selected. The previous performances of the presses were studied from their breakdown details collected from the industry. Breakdown details for the specific period were collected and analyzed to calculate monthly Overall Equipment Effectiveness (OEE) for both the mechanical presses. OEE is a Key Performance Indicator (KPI) representing the overall productivity of any machine. These monthly OEE values were then averaged and the average OEE was compared to the world-class OEE. From the study carried out, it was observed that average OEE of the 600 tonne press was very low when compared to the world-class OEE target range (60-85%). Total Productive Maintenance (TPM) is found to be an effective maintenance strategy to improve the OEE of the equipment. Hence in order to improve the OEE, it was decided to implement TPM on 600 tonne mechanical press.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Downloads

Published

2023-05-24

How to Cite

Prashanth Pai M., Ramachandra C. G., Raghavendra M. J., & Yathin Krishna. (2023). A Case Study to Determine OEE – A KPI Representing the Overall Productivity of a Machine. Journal of Mines, Metals and Fuels, 71(3), 359–366. https://doi.org/10.18311/jmmf/2023/33720

Issue

Section

Articles

 

References

Nakajima, (1988): Introduction to Total Productive Maintenance. Productivity Press, Cambridge.

Nazim Baluch, et al., (2012): Measuring OEE in Malaysian Palm Oil Mills. Interdisciplinary Journal of Contemporary Research in Business, Vol. 4, No. 2, pp. 733-743.

Bhadury B., (2000): Management of productivity through TPM. Productivity, Vol. 41, No. 2, pp. 240-251.

Chetan S. Sethia, et al., 2014, Total Productive Maintenance- A systematic review. International Journal for Scientific Research & Development, Vol. 2, No.8, pp. 124-127.

Amit Kumar Gupta and R. K. Garg, (2012): OEE Improvement by TPM Implementation: A Case Study. International Journal of IT, Engineering and Applied Sciences Research, Vol. 1, No. 1, pp. 115-124.

R. Raghuram, (2014): Implementation of Overall Equipment Effectiveness (OEE). Middle-East Journal of Scientific Research, Vol. 20, No. 5, pp. 567-576.

A. Bangar, et al., (2013): Improving Overall Equipment Effectiveness by implementing Total Productive Maintenance in auto industry. International Journal of Emerging Technology and Advanced Engineering, Vol.3, No.6, pp. 590-594.

Aditya Parida and Udaya Kumar, (2009): Maintenance Productivity and Performance Measurement. Springer- Handbook of Maintenance Management and Engineering, ISBN: 978-1-84882-471-3, pp. 17-41.

Jitendra Kumar, (2022): Evidence of manufacturing productivity using TPM in Indian industry: A survey. International Journal of Latest Engineering Science, Vol. 5, No. 2, pp. 8-19.

S.D. Kalpande, (2014): OEE-An effective tool for TPM implementation- A case study. Proceedings of 8th International Quality Conference, Center for Quality, Faculty of Engineering, University of Kragujevac, pp. 521-526.

R.Vijayakumar and S.Gajendran, (2014): Improvement of Overall Equipment Effectiveness (OEE) in injection moulding process industry. IOSR Journal of Mechanical and Civil Engineering, pp. 47-60.

Mohamad Nasir et al., (2019): Application TPM to increase the effectiveness of engines with OEE as a tool to measure in the industrial packaging cans. International Journal of Innovative Science and Research Technology, Vol. 4, No. 7, pp. 1314-1331.

Muhammad Babar Ramzan et al., (2022): Development and evaluation of overall equipment effectiveness of knitting machines using statistical tools. SAGE Open, Vol.12, No.2, https://doi.org/ 10.1177/ 21582440221091249.

Vinayak Suryawanshi and Rajesh Buktar, (2015): Leveraging TPM for increase in the OEE of CNC machine. International Journal of Modern Engineering Research, Vol. 5, No. 9, pp. 18-26.

Blanchard B.S, (1997): An enhanced approach for implementing total productive maintenance in the manufacturing environment. Journal of Quality in Maintenance Engineering, Vol. 3, No.2, pp. 69-80.

Aswin Joseph and M S Jayamohan, (2017): Evaluation of Overall Equipment Effectiveness and Total Effective Equipment Performance: A Case Study. International Journal of Advance Engineering and Research Development, Volume 4, Issue 5, pp.343-346.